Rayfin Micro Stereo System User Manual

Deployment Checks

Download the Deployment Checklists below:

Pre-Deployment Checks.pdf

Post- Deployment Checks.pdf

1. Pre-Deployment Checks

Pre-Deployment Checklist

Mechanical Components

1

Check the Wire Rope Isolators for any obstructions to the free movement of the system

☐

2

Check that the Wire Rope Isolator has no stranded wires (Bird-caging) or bent wire ropes.

☐

3

Verify all fasteners are present and properly secured

☐

4

Verify the system sits perfectly level and straight

☐

5

Verify no debris is present on or in the Wire Rope Isolator assemblies

☐

6

Check that all components are secured

☐

7

Check Viewports for any cracks or scratches; clean with freshwater and a microfiber cloth

☐

Electrical Components

1

Verify connectors are adequately greased

☐

2

Verify all connector pins are straight and lining up with the relevant connectors correctly

☐

3

Verify all connectors are correctly oriented

☐

4

Verify all locking sleeves are properly installed and secured, and all connections are tight.

☐

5

Check all cables for any visible damage, nicks, kinks, etc.

☐

2. Post-Deployment Checks

Post-Deployment Checklist

Mechanical Components

1

Rinse the entire system with fresh water to remove salt

☐

2

Check for any debris trapped inside Wire Rope Isolators and remove it (if any)

☐

3

Check for stranded wires on the Wire Rope Isolators

☐

4

Check that all fasteners are present and fully secure

☐

5

Verify all components are still secure

☐

6

Check that all viewports are damage-free

☐

Electrical Components

1

Check all electrical cables for any visible damage, nicks, kinks, etc.

☐

2

Check that all connections are secure and properly locked

☐

3

Check that all electrical connections are fully functioning by performing

☐

The system must be fully powered down before disconnecting any electrical connections. Failure to do so may result in water ingress into live connections and cause catastrophic damage.