Deploying the system off a vessel using a boom arm (exact steps determined in integration meetings)
READ WINCH MANUAL BEFORE OPERATING. Refer to Winch Safety Page Before Operating
Deployment Operation
NOTE: Depending on the kind of vessel and type of deployment equipment, you may want to have the vessel moving before deploying the equipment, or after it is already in the water.
This is specific to the situation and should be determined based on what must be done to keep things clear of the propellers and to meet any applicable safety regulations.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|