Before deploying the DCS in the field, perform the following checks. |
|
|
Components Requiring Inspection
|
Passing Criteria
|
||||||||
|
1 |
Camera pivot assembly |
Oriented to the correct angle for deployment. |
||||||||
|
2 |
Camera, LED, laser(s) |
|
||||||||
|
3 |
Cabling and wire rope bridles |
No tangles. |
||||||||
|
4 |
Bridle and Bridle tabs |
Installed correctly; all tab bolts tightened. |
||||||||
|
5 |
Main deploy line |
No visible damage at any location along the cable line. |
||||||||
|
6 |
Spar shaft collars |
All flush against adjacent components and tightened. |
||||||||
|
7 |
Main support panels |
All screws tightened. |