SubC Drop Camera System Manual

Drop Deployment Planning

Planning your Drop Deployment route

DVYoQEBWnKlcn6AitexWprQUb22y_qcsUdbAYCuMNLy6iDwxJaz2Mtf84qbNstpGo3S3hNEFYF2r3Alom96DL4Jpb3e714AHZpuxlfpy1OaB-SaLJzAjO8yluiJx9g0e5dp70d4Uva_7gLKWSxzgG-cFFQ=s2048
image-20230518-124001.png

Deployment Planning

  • Before ever taking the system out, it is important to plan your trip accordingly.

Hydrographic Marine Charts

  • It is advisable to use high-quality, trusted hydrographic marine charts to understand the expected terrain before towing, to mitigate the risk of snags or underwater collisions.  

  • If this is not available, for example, in very remote locations, it is advisable to conduct a hydrographic survey before using the DCS.

Deployment Site Planning

  • Plan your drop locations in relatively flat areas, keeping a safe distance from the coast if near shore.

  • Avoid deploying directly over or adjacent to steep underwater cliffs or severe drop-offs. The chances of the system swinging into obstructions due to vessel drift or underwater currents are highly increased in these types of dynamic geography.

Seafloor Conditions

  • Note the expected type of seafloor at your drop site. Is it a sandy bottom, gravel, rocky, or boulders? If this information is not available on local charts, execute a cautious initial descent. Lower the DCS slowly and utilize the live video feed and altimeter data to establish visual contact while remaining safely above the seabed.

  • If operating in a rocky area with large boulders or complex structures, maintain a safe vertical clearance. Keep the DCS suspended high enough to avoid collision, keeping in mind that surface vessel heave (wave action) translates directly down the tether. A test deployment pausing at a higher altitude is advised to assess the terrain safely before moving closer.